Plants.
Feathered trees on dwarfing rootstock, variety-matched to your altitude and market.
- Gala, Fuji, Red Delicious clones and pollinisers
- M9 / MM106 rootstock, virus-indexed
- Planted at 3 m × 1 m or 3.5 m × 1.5 m
Plants, trellis, drip irrigation and anti-hail net — designed, supplied and installed by one team.
Feathered trees on dwarfing rootstock, variety-matched to your altitude and market.
Galvanised or concrete posts every 8 m with four high-tensile wires per row and anchored end posts.
One inline lateral per row from a filtered main, sized for your water source.
Poles on a 10 m grid, perimeter cable and UV-stabilised net over the whole plantable area.
Tell us your village and roughly how many kanal you want to plant. We call back within a working day.
An inspector walks the boundary with GPS, checks water, slope and access, and photographs the plot.
Rows, posts, wire, drip and net are laid out on your actual plot; you get a link with the map, the quantities and the price.
Approve the quotation, pay the advance by UPI or bank transfer, and we book your material and crew.
Posts, wire, pipe and net arrive with a delivery challan; you can see every item against the design.
Our crew installs the trellis, drip and net and plants the trees, with daily progress photos.
A joint checklist and warranty on the structure. Tears, leaks or mortality — one call and we come.
At 3 m × 1 m spacing a kanal (505 m²) takes about 150–165 plants after headlands; the estimator shows the exact count for your area and template.
Bare-root plants go in from late November to March while the trees are dormant. Trellis, drip and net can be installed any time the ground is workable, so we book sites for structure work through summer and autumn.
Yes — feathered trees on M9 and MM106 rootstock from our nursery partners, with variety and rootstock written on the quotation. You can also bring your own plants and we install the rest.
It depends on pole spacing and the net grade; the estimator prices the net separately so you can see the orchard with and without it.
A 10-kanal site is usually trellised and dripped in 10–14 working days once material is on site; plants take two more days. Net installation follows in a separate pass.
We prepare the design, quotation and GST invoices that departmental schemes ask for, and tell you what to file; the application itself stays with you.
Tell us your village and how many kanal. We call back within a working day and book the inspector.